Search
Close this search box.
Search
Close this search box.

Construction Updates

Complete

Early works to investigate ground conditions are in sections adjacent to the Bicentennial Bikeway, which may require some temporary reductions

Complete

Night work will occur on Tuesday 1 September and Wednesday 2 September, for two nights only, while a 250 tonne

Complete

To create a safe work zone, a section of the Bicentennial Bikeway, adjacent to the Finger Wharves, will be intermittently

Complete

From 8 September to 11 September 2020 night works will occur adjacent to the Bicentennial Bikeway. When: Night works along

Complete

To create a safe work zone, a section of the Bicentennial Bikeway, adjacent to the Finger Wharves, will be intermittently

Complete

Early works to investigate ground conditions are in sections adjacent to the Bicentennial Bikeway, which may require some temporary reductions

Complete

From Sunday 5 July 2020 night work will occur along Margaret Street and then George Street temporarily affecting traffic and

Complete

At times during May and June 2020 from 6.30pm until 2.30am, some night works may be required on-site to undertake

Complete

On Tuesday 19 May and Wednesday 20 May 2020 early works including vegetation removal will occur at South Bank ahead

Complete

Motorcycle parking along North Quay between Tank and Ann Streets has reopened and the temporary parking on William Street (outside

Complete

Work is continuing with night works required intermittently within the existing lane closures on North Quay until mid to 20th

Complete

On the night of Tuesday 18 February work will occur on Margaret Street to complete the installation of an overhead

Complete

The section of George Street, in front of the Queen’s Wharf site, has been reduced to one lane in each

Complete

The section of George Street, in front of the Queen’s Wharf site, will be reduced to one lane in each

Complete

Multiplex is completing final heavy machinery removal and gravel load-in on Queen’s Wharf for three nights only during November. When:

Complete

On Saturday 2 November 2019, a temporary road closure will be required along George Street between Charlotte and Margaret streets

Complete

Multiplex is continuing with material haulage on Queen’s Wharf with night works required Sunday to Friday nights (excluding Saturday nights)

Complete

On Saturday 26 October and Sunday 27 October 2019, a temporary road closure will be required along George Street between