Construction Updates
Back

Alice Street Metered Parking Temporary Removal

From Saturday the 13th of April 2019 through to the end of September 2019, the six metered car park spaces on Alice Street, between George & William Streets will be temporarily removed to allow for construction activities.

When:

From Saturday the 13th of April 2019, the six metered car parks will be removed and then be reinstated post completion of the construction works. These works are anticipated to be completed at the end of September 2019.

Where:

The car parks are located along Alice Street, opposite QUT.  The nearest cross streets are George & William Streets. See map attached.

What to expect:

These car parks are required to be removed for the safe access of both construction traffic and pedestrians.  There will be no other change in traffic flows or pedestrian footpath access.

The area in question is represented on the map below.