On Monday 19 and 26 August between 6:30pm and 12:30am the main resort will do acoustic testing of its sound system.
When:
Between the hours of 6:30pm and 12:30am on Monday 19 & 26 August, acoustic testing and calibration of the resort sound system is required within approved operational noise levels.
Where:
The sound testing will be within the resort including Sky Deck, Leisure Deck, and George Street entry.
What to expect:
Acoustic testing including varying tones, sounds and music from the sound system.
These will be within approved operational levels.