Updates Share

Temporary pedestrian diversion for intersection of William and Queen streets

Night works: Water main connection works will occur in the footpath area at the corner of William and Queen streets overnight between Monday 17 July and Thursday 20 July from 8pm until 5am.

When:

Night works will take place between Monday 17 July and Thursday 20 July 2017 from 8pm until 5am to connect a water main.

The work is necessary to connect important services as part of the demolition and enabling works for Queen’s Wharf Brisbane.

Where:

The works will occur within the footpath area at the eastern corner of the William and Queen streets intersection, beside the Queen Street Mall busway entrance/exit.

See attached map overleaf for details.

What to expect:

Pedestrian access will be maintained at all times.

Clear directional signage and traffic controllers will be in place to minimise disruption and assist pedestrians if required.

Equipment used will include small excavators, concrete cutters and concrete placing machinery.

 

170707 - Construction Update - Water main connection cnr QueenSt - Rev B